"Felt confident in their plan from day one. The site was tidy, the timeline was excellent, and the result added real character to our period flat."
Bathrooms
Full Bathroom Refurbishment, Single-Trade Managed
Plumbing, tiling, electrics, plastering and decoration on one schedule, run by one project manager. We handle full bathroom and en-suite refurbishments across London — strip-out to sign-off in 7–10 working days.
A bathroom refurbishment touches more trades than any other room. We coordinate them all under one project manager.
We work with mainstream UK suppliers (CP Hart, Drummonds, West One Bathrooms, Lusso, Soakology). Tanking is to BS 5385, electrics certified to Part P.
What's included
- Full strip-out to brick
- Wet-room tanking BS 5385
- Underfloor heating
- Part-P certified electrics
- Hand-cut tiling
- Stone & porcelain finishes
- Fitted vanity joinery
- 7–10 day typical schedule
How We Craft Your Interior
Design & specification
We agree the layout, plumbing positions, finish materials and lighting plan.
Strip-out & first fix
Existing fittings removed, room taken back to brick or studwork, plumbing and electrics roughed in.
Tanking & tiling
Walls and floors tanked to BS 5385, underfloor heating laid, then tiled by a single tiler for consistency.
Second fix & sign-off
Sanitaryware fitted, taps and showers commissioned, joinery and decoration completed.
Bathrooms — Common Questions
Do you provide a free quote? +
Are you insured and certified? +
How long does a typical project take? +
Will you protect my floors and furniture? +
Do you guarantee the work? +
What They Say About Our Work
"I was impressed by how carefully they listened to what we wanted. The quality of the panelling is exceptional — our space now feels elegant and well designed."